CSTONE
RFQ List

Product details

RF Adapters - Tee TRB Fixed Parrallel One Male to Two JKs

China-sourced compatible alternative — fit confirmed by drawing/spec review.

Part number (MPN)

TN2

Need a custom version from drawing?

We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.

Custom RF cable from drawing →
WhatsApp — Quick Reply
Lead time: 3–6 wks | MOQ: 200+ pcs
Before RFQ Clear inputs speed up review.
  • Share the reference MPN and source brand if it matters.
  • Add the BOM and volume split for production projects.
  • Attach the drawing or the key fit requirements.

Image

Click image to enlarge.

Product image

TN2 product photo

TN2 product photo

Specifications

Specifications for TN2
InterfaceRF Adapters - Tee
GenderPlug
GenderJack
Body MaterialBrass
Side 2 PolarityNormal
Product CategoryRF Adapters - Tee
SubcategoryRF Adapters
Shell PlatingNickel
Side 1 PolarityNormal
RoHSY

Description

Reference MPN listed for TN2. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Material is listed as Brass. That is useful for review, but it does not replace full project stack-up confirmation. Use this page to shortlist before RFQ, not as the final sign-off.

Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.

Similar Connectors

Related models:

MPN Search Supports exact, prefix, and partial matching.

Supports exact, prefix, and partial matching.

Disclaimer

Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.