Product details
Modular Connectors / Ethernet Connectors
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| RoHS | Y |
Description
Reference MPN listed for SS74800-031F. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
C091 31H003 100 5 U
Circular DIN Connectors Male Cable Connector, Quicklock, Size M16, 3 Contacts, Silver Contact Plating, Ring Nut
56377-2000
I/O Connectors Compact Robot Conn R Conn Rec Shell 20Ckt
RM12PIE51ERPLF
D-Sub Contacts M PWR CT HAND SOLDER
B60T90-141T-
BNC reverse polarity plug to TNC reverse polarity jack using .141 semi-rigid
RJMG178007101ER
Modular Connectors / Ethernet Connectors RJ45 1X1 10/100 SINK TYPE
112526
BNC Right Angle Crimp Plug RG-55 RG-142 RG-223 RG-400 50 Ohm
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.