Product details
Modular Connectors / Ethernet Connectors SMT 8P8C W/ Shield 2 Port
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| Packaging | Tray |
| Number of Ports | 2 Port |
Description
Reference MPN listed for RJSSE558202. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
2-5329446-1
RF Connectors / Coaxial Connectors S.C. PLUG 50 OHM
75897-510-000 CNS-0404
D-Sub Backshells CNS-0404 BLACK KIT
142-1801-626
RF Connectors / Coaxial Connectors .018 FLANGE MT PLUG
22_SMA-50-0-44/133_NE
RF Connectors / Coaxial Connectors SMA straight bulkhead receptacle jack(f)
MKJ3C7F12-37CX
D-Sub Standard Connectors
RJSAE538G02
Modular Connectors / Ethernet Connectors RJSAE538G02-RJ45StackedshldLEDs2Port
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.