Product details
Modular Connectors / Ethernet Connectors RJ45 Stacked LEDs 8 Port
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Packaging | Tray |
| Number of Ports | 8 Port |
Description
Reference MPN listed for RJSNE5F8GA8. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
RJHSEE38C08
Modular Connectors / Ethernet Connectors RJ45 Shielded LEDs 8 Port
GMXHT-N-44-50
Modular Connectors / Ethernet Connectors HITEMP M/JK L/ PROF RT<4P4C BLK 50U
031-8714-661
D-Sub Standard Connectors
CGF6M36D06PN
D-Sub Standard Connectors
625FS001M14
D-Sub Tools & Hardware
MICROBENDR-11HT
RF Cable Assemblies SMA plug(m) to SMA plug(m) Ruggedized CAY High Temp with .47 Flex Cbl MAX Freq 26.5 GHz
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.