Product details
Modular Connectors / Ethernet Connectors RJ45 RA Shielded W/ LEDs
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Packaging | Tray |
Description
Reference MPN listed for RJSBE538PC4. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
TNC8405GE-0000-HS
TNC jack bulkhead PCB mount with round contact (1.1) 11GHz VSWR1.2
MWDM2L-21SBR-.190
D-Sub Micro-D Connectors MICRO D PCB CONN 21SKT CNT
163A12339X
D-Sub Standard Connectors 25 POS M SO TIN GI FLT BUSHING
L777DFB25P1BON
D-Sub Standard Connectors D-SUB
85120068
INSTRUMENTATION GRADE - Phase and amplitude stable microwave test assemblies
A-1PA-081-250B2
RF Cable Assemblies AMC RA PLG JMP .81MM 250MM BLK U.FL COMPT
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.