Product details
Modular Connectors / Ethernet Connectors RJ45 RA No Shield W/ LED
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Packaging | Tray |
Description
Reference MPN listed for RJSBE508KC2. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
3013W6PXK99A30X
D-Sub Mixed Contact Connectors 13W6 M UNC-4-40 INSERTS CRIMP TYPE
G125-FD22669F1-0700F1
13+13 Pos. Female DIL 28 AWG Cable Assembly, 700mm, twisted pair double-end shielded, Screw-Lok
PL1MW-026
RF Connectors / Coaxial Connectors Mini Weco PTCH Plug Full CRMP STR
317-1796-000
D-Sub Standard Connectors
164A19649X
D-Sub Standard Connectors DSUB SOLDER PIN ANG 14.19mmPREC MCHD CNT
SFPC-4SL-02-S
I/O Connectors SFP+ Cage
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.