Product details
Modular Connectors / Ethernet Connectors RJ45 RA No Shield W/ LED
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Packaging | Tray |
Description
Reference MPN listed for RJSBE508GC2. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
B60T95-316-
BNC reverse polarity plug to TNC reverse polarity jack bulkhead using RG316
680S5W5103L401
D-Sub Mixed Contact Connectors IP67 POWER-D 5w5PWR 40A MALE SOLDER CUP
5207953-2
D-Sub Tools & Hardware DSUB ACC: FEMALE SCREWLOCK
40-9737H
D-Sub Backshells HOOD PLASTIC 37 POS. STANDARD
9665117501
D-Sub Standard Connectors DSUB SV FEM SSDP STR 50P AU3
095-725-121M100
RF Cable Assemblies SMP RA Plg to SMP RA Plg 0.047 CfCbl 1m
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.