Product details
Modular Connectors / Ethernet Connectors RJ45 RA Shielded W/ LEDs
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Packaging | Tray |
Description
Reference MPN listed for RJHSEJ481. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
610-0300
Circular DIN Connectors PLUG NICKEL 3 PIN
FMAD1678
High Temperature Adapter 2.92mm Male to 3.5mm Male, 34.5GHz VSWR1.25, MIL-STD 348B with Stainless Steel Body
L177TWC25W3SHCSV4RRM6
D-Sub Mixed Contact Connectors COMBO D SUB
N3100AS-L600
N plug crimp for JBY600,LMR600; 4Ghz VSWR1.2
12226-8200-00PL
D-Sub Micro-D Connectors SDR BRD MNT CONN RA SMT TYPE
BMK21A-1M4Z1 right angle jack
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.