Product details
TOOL / SMPM EXTRACTION TOOL FOR R201705xxx BULLET ADAPTERS
Part number (MPN)
Interface
SMPM
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | SMPM |
|---|---|
| Interface | Tooling |
| Specific Feature | EXTRACTION TOOL |
Description
Current reference data for R282918200: SMPM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
SC5188
SMP Male (Plug) Full Detent Hermetically Sealed Connector Pin Terminal, Solder Full Shroud Full Body, Up To 8 GHz
P89PM89-47T-18G
18GHz -16.5dB SMP jack right angle to SMPM jack right angle using .047 semi-rigid
R222402721
SMP / STRAIGHT PRESS-MOUNT SCHROUD SMOOTH BORE
1211-40004-TD
RF Connectors / Coaxial Connectors SMP M Surface Mount Conn R/A, LD, TinDip
7012-1065
RF Cable Assemblies SMP F - 2.92mm M C/A for .047 Cbl OAL 12"
SF1212-6002
RF Connectors / Coaxial Connectors SMP M PCB Thru-Hole Conn, R/A, SB
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.