Product details
D-Sub Standard Connectors MICRO 51 M SOD JACKS
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Filtered | Unfiltered |
| Part # Aliases | 096522-0083 |
| RoHS | N |
Description
Reference MPN listed for MDM-51PSK. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
44150-0013
Modular Connectors / Ethernet Connectors Modjack RA Flgls Cat at5 PTH 6Port Shield
1438892-3
RF Connectors / Coaxial Connectors SHELL PLUG RG-62 RG-62U/M 180 DEG
165X10429XE
D-Sub Backshells PLASTIC HOOD 50 POS BLK STRIAGHT ENTRY
160X10159X
D-Sub Tools & Hardware SLIDELOCK SIZE 9 SELFTAP
L17H2332131
D-Sub Dualport Connectors D-SUB STACKED
T3649-502
Circular DIN Connectors MALE CABLE CONNECTOR 14 WAY
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.