Product details
D-Sub Standard Connectors
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Filtered | Unfiltered |
| Part # Aliases | 095487-0018 |
Description
Reference MPN listed for MDB1-37SS. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
ATT-0294-07-SMA-02
Attenuators - Interconnects 7DB DC-2 GHZ ATT
MWDM1L-21P-6J7-18F
D-Sub Micro-D Connectors
MWDM1L-100P-8E7-6K
D-Sub Micro-D Connectors MICRO D PREWIRED CON 100CNT PIN #28AWG
242A10680X
D-Sub Standard Connectors C-FLTR SLDR PIN STR 4-40 OR M3 SPACR/PCB
164A17139X
D-Sub High Density Connectors DSUB SLDRCUP AWG22 3mmTH PREC MCHND CNT
303W3CPXX56K40X
D-Sub Standard Connectors 3W3C M R/A 20A POWER
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.