Product details
Modular Connectors / Ethernet Connectors 1x2 Tab-Up W/LED'S ETHERNET (NON PoE)
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| Number of Ports | 2 Port |
| Part # Aliases | JGL-0004NL |
| RoHS | Y |
Description
Reference MPN listed for JGL0004NL. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
MDVB1-15PH006
D-Sub Standard Connectors
MWDM2L-51S-4C4-.125B
D-Sub Micro-D Connectors PCB CONN 51SKT CNT
RJHSEG08P04
Modular Connectors / Ethernet Connectors RJ45 No Shield LEDs 4 Port
CPL-5211-20-SMR-79
RF Connectors / Coaxial Connectors 20DB 1-2 GHZ CPLR
DCDM-9P6E5-18.0L
D-Sub Micro-D Connectors MICRO 9C PIN 18" RBW JACKS
27-8471
RF Adapters - In Series BNC 50 OHM FEMALE ISO. DUAL BNC(F)
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.