Product details
XP connector; protection IP50
Part number (MPN)
Interface
XP
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | XP |
|---|---|
| Interface | Straight Plug |
| IP rating | IP50 |
| Compliance | Y |
| Category | 连接器与射频产品 |
Description
Current reference data for FGG.0B.752.DN: XP. If mounting is missing here, confirm it from the drawing or mating requirement. The catalog also lists a sealing or protection value of IP50. Check that against the real environment requirement in RFQ. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
FGB.1B.304.CLAD72
B - Indoor keyed Series connector
25_BMA-50-3-3/119_NE
RF Connectors / Coaxial Connectors
MWDM3L-9SCBSPU-.172
D-Sub Micro-D Connectors MICRO D PCB 9S SHRT JKPST.172"TAIL STEEL
BNC8205D-0316
BNC jack clamp bulkhead for RD316,RD316-FEP; 4GHz VSWR1.2
87180-366
Modular Connectors / Ethernet Connectors LOW PROFILE PCB
919-NM119J-51A
MCX Right Angle PCB Jack Through Hole 50 Ohm Non-Magnetic
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.