Product details
D-Sub Tools & Hardware Positioner for crimping tool
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Tools & Hardware |
|---|---|
| Interface | Positioner |
| Product | Tools |
| Product Category | D-Sub Tools & Hardware |
| Subcategory | D-Sub Connectors |
| For Use With | Machined Contacts |
| Filtered | - |
| RoHS | N |
Description
Reference MPN listed for EP-580. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
MWDM2L-21P-4J5-18H
D-Sub Micro-D Connectors
5552725-7
I/O Connectors ASSY, RCPT 50 POSN RTANG
MWDM2L-37P-6K7-96K
D-Sub Micro-D Connectors MICRO D PREWIRED CON 37CNT PIN #26AWG
M7685-05
2 Pos. Female Jumper Socket, Handle Shunt, Red
R114073000W
RF Connectors / Coaxial Connectors SMB (F) STG FX CR 2/50 SS
MWDM2L-25S-6E1-36R
D-Sub Micro-D Connectors MICRO D PREWIRED CON 25CNT SKT #26AWG
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.