Product details
D-Sub Standard Connectors
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Filtered | Unfiltered |
| RoHS | Y |
Description
Reference MPN listed for DEMM9SF225. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
2173238-1
I/O Connectors 1x3 CAGE ASSY, BEZEL
MWDM1L-31P-6K1-18R
D-Sub Micro-D Connectors MICRO D PREWIRED CON 31CNT PIN #26AWG
L77HDEH15SOL2RM8PLE
D-Sub High Density Connectors L77HDEH15SOL2RM8PLE-Stamped sgnl 3A Strght PCB Thru Hole
ADP-SMAM-RPSF-G
RF Adapters - In Series SMA Plug to RP-SMA Jack Adapter
MWDM1L-15PCBR-.110
D-Sub Micro-D Connectors MICR D PCB CON 15P CNT
FMC0716316
MCX Plug (Male) to SMB Plug (Male) Cable M17/113-RG316 Coax Up To 3 GHz, 1.35 VSWR
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.