Product details
DEMAMF9S-FO — D-Sub Standard Connectors DSUB 9 F CRIMP FLOA F0 ZINC
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Number of Rows | 2 Row |
| Insert Arrangement | E09 |
| Shell Size | 1 (E) |
| Filtered | Unfiltered |
| Number of Positions | 9 Position |
Description
Current reference data for DEMAMF9S-FO: 9 Position. The catalog currently lists the configuration as: 9 Position. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
RJHSE538H06
Modular Connectors / Ethernet Connectors RJHSE538H06-8P8C RA Shield LEDs 6 Port
903-505J-51S1
SMB Straight Crimp Jack RG-316DS Bulkhead 50 Ohm
MWDM5L-25SCBSPU-.110
D-Sub Micro-D Connectors
102526
SMB7H-P-C-H-ST-CA3
RF Connectors / Coaxial Connectors
MWDM5L-9SCBRR3-.125-429C
D-Sub Micro-D Connectors
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.