Product details
D-Sub Standard Connectors DDMF50SN-DSUB DM SIG STB 50 SOCK
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Packaging | Tray |
| Filtered | Unfiltered |
| Number of Positions | 50 Position |
Description
Reference MPN listed for DDMF50SN. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
40-9715HG
D-Sub Backshells HOOD PLASTIC 15 POS. STNDRD W/RUBBER GROM
FMCA2730
SMA Male to TNC Male Right Angle Cable Using RG223 Coax
32K607-302L5
RF Connectors / Coaxial Connectors BULKHEAD JACK
A60S39-L195-
SMA reverse polarity plug to SMB plug right angle using JBY195
85031354
Single packaging
557-083N1-321
D-Sub Backshells SHORTING CAP SOLID BACKSHELL
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.