Product details
D-Sub Standard Connectors DSUB 37 F PCB STR G ZINC
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | D-Sub Connectors - Standard Density |
|---|---|
| Product Category | D-Sub Standard Connectors |
| Subcategory | D-Sub Connectors |
| Filtered | Unfiltered |
Description
Reference MPN listed for DC37SV. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
PE3C1792LF
FMCA2477
Low PIM 4.1/9.5 Mini DIN Male to N Female Bulkhead Cable TFT-5G-402 Coax Using Times Microwave Components
LCCN45866
RF connector; configuration: Right Angle; impedance 50 Ohm; frequency DC
FGG.1B.303.SLAD62Z
B - Indoor keyed Series connector
EBC.5S.330.CLL
S - Indoor Stepped Insert Series connector
152102
SMC Straight Crimp Jack RG-174 RG-188 RG-316 Times LMR-100A 50 Ohm
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.