Product details
D-Sub Tools & Hardware
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Tools & Hardware |
|---|---|
| Product Category | D-Sub Tools & Hardware |
| Subcategory | D-Sub Connectors |
| Packaging | Bulk |
| Filtered | - |
| Part # Aliases | 211-0162-2-00 |
| RoHS | Y |
Description
Reference MPN listed for DB-25S-DC. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
R302205003090
MML / PLUG H2.0 - SMA BULKHEAD JACK CABLE ASSEMBLY 1.13/50/S LGTH 090CM
SMA8400-0000
SMA jack PCB mount with round contact (1.27) 18GHz VSWR1.2
MWDM6L-100S-6K7-18B
D-Sub Micro-D Connectors MICRO D PREWIRED CON 100CNT SKT #26AWG
5174216-5
D-Sub Standard Connectors AMPLIMITE.050 CAP ASS Y 20P PB-FREE
59Z016-000C
RF Connector Accessories Plastic housing Plug Straight C Blue
L17H3562125
D-Sub Dualport Connectors D-SUB STACKED
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.