Product details
Adhesive Tapes connector
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | Tape |
|---|---|
| Category | Adhesive Tapes |
| Compliance | Y |
Description
Reference MPN listed for CXS-1. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
FFA.0A.275.CTAK62
EGR.LM.U2A.XPP
M - Rugged Ratchet coupling Series connector
PHG.4K.304.CYMK16
K - Outdoor keyed Series connector; configuration: Crimp
165X14899X
D-Sub Backshells DSUB 9-50POS IP67 STR ENTRY PLSTC HOOD
163A50049X
D-Sub Adapters & Gender Changers 50P SOCKET TO PLUG ADAPTER
TM13R-1006(50)
Modular Connectors / Ethernet Connectors 6P F MODULAR JACK GANGED TYPE T/H
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.