Product details
Modular Connectors / Ethernet Connectors Minicom MOD, CAT6 Shielded, 8 pos
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| RoHS | Y |
Description
Reference MPN listed for CJS688TGGRY. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
TJ50A-41S-D-CV1
I/O Connectors
HRMM-208-1-C(41)
RF Connectors / Coaxial Connectors
A95S30-85T-
SMA reverse polarity jack bulkhead IP67 mated to SMB plug using .085 semi-rigid
FMCN1858
SSMA Female Bulkhead Connector Crimp/Solder Attachment For RG174, RG316, RG188, .177 inch D Hole
9651217701
D-Sub Standard Connectors DSUB SV ML SSDP STR 09P PL3 NUT M3
FCC17E09PC690
D-Sub Standard Connectors 9P R/A Pin M3 x 0.5 Thread 5600 pF
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.