Product details
RF component — quote request
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | Connectors Rf Interconnects Rf Adapters |
|---|---|
| Category | Connectors Rf Interconnects Rf Adapters |
Description
Reference MPN listed for ADAPTFMEFFMEF. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
173109-0295
D-Sub Standard Connectors FCT DSUB CRP PLG 9 PN
MWDM5L-21P-8J7-18P-429B
D-Sub Micro-D Connectors
R302255003325
MML / PLUG H2.5 PIGTAIL 1.37/50/S LGTH 325CM
03AS102-K40S3
Attenuators - Interconnects ATTENUATOR
RJSNEJ08408
Modular Connectors / Ethernet Connectors RJ45 Stacked LEDs 8 Port
LD15P33E4GV00LF
D-Sub Standard Connectors LD15P33E4GV00LF
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.