Product details
BNC plug to single banana plug
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | Low Voltage ProductsAdaptor Breakout |
|---|---|
| Category | Low Voltage ProductsAdaptor Breakout |
Description
Reference MPN listed for AD-B3BA3. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
B39T60-85S-
BNC plug right angle to TNC reverse polarity plug using .085 conformable
095-850-292-024
BNC Straight Plug IP67 to BNC Straight Plug IP67 RG-58 50 Ohm 24 inches (610 mm)
5414974-1
RF Connectors / Coaxial Connectors JACK,RTANG,50 OHM BNC PCB
UCCS-025-026
RF Connector Accessories BNC Adapter 75 Ohm Inline 734-735 Cable
UPCMWX-36-75
RF Cable Assemblies MINI WECO BNC 36 RG59
BNC84VM-9000
BNC jack PCB mount bulkhead right angle with round contact (1) 4GHz VSWR1.2
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.