Product details
ESKA? connector; configuration: Standard
Part number (MPN)
Interface
ESKA?
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| Interface | ESKA? |
|---|---|
| Orientation | Standard |
| Operating Temperature | -55°C~85°C |
Description
Current reference data for 81 0030: ESKA? · Standard. The catalog currently lists the configuration as: Standard. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
FMCA2772
N Male to TNC Female Cable Using RG223 Coax
122403
RF Connectors Coaxial Connectors TNC BULKHEAD JACK 178196 6.5 PANEL
PKG.2B.306.CYMD72
B - Indoor keyed Series connector; configuration: Crimp
1-1337583-0
RF Connectors / Coaxial Connectors R/A SMT Skt 50Ohm Gold Pltd
FMAD1035
Low PIM N Female (Jack) to 7/16 DIN Male (Plug) Adapter, High Temp
336203-12-0200
AMC Right Angle Plug to TNC Straight Bulkhead Jack 1.13 mm 50 Ohm 200 mm
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.