CSTONE
RFQ List

Product details

I/O Connectors SFP+ 1x6 Ganged Cage Cage for Light Pipes

China-sourced compatible alternative — fit confirmed by drawing/spec review.

Part number (MPN)

74754-0610

Need a custom version from drawing?

We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.

Custom RF cable from drawing →
WhatsApp — Quick Reply
Lead time: 3–6 wks | MOQ: 200+ pcs
Before RFQ Clear inputs speed up review.
  • Share the reference MPN and source brand if it matters.
  • Add the BOM and volume split for production projects.
  • Attach the drawing or the key fit requirements.

Specifications

Specifications for 74754-0610
InterfaceI/O Connectors
InterfaceCage Assembly, 1x6 Ganged
OrientationHorizontal
TerminationPress Fit
MountingThrough Hole
PackagingTray
ProductSFP Connectors
Product CategoryI/O Connectors
Current Rating-
SubcategoryI/O Connectors
Number of Ports6
Unit Weight25 g
Show 2 more specs
Part # Aliases0747540610
RoHSY

Description

Current reference data for 74754-0610: Horizontal · Horizontal · Press Fit. The catalog currently lists the configuration as: Horizontal · Press Fit. Mounting is listed as Horizontal. If panel, bulkhead, or flange constraints matter, send the dimensions with the RFQ. Use this page to shortlist before RFQ, not as the final sign-off.

Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.

Similar Connectors

Related models:

MPN Search Supports exact, prefix, and partial matching.

Supports exact, prefix, and partial matching.

Disclaimer

Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.