Product details
D-Sub Backshells DUAL ENTRY SOLID BANDING BKSHLL
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Backshells |
|---|---|
| Product Category | D-Sub Backshells |
| Subcategory | D-Sub Connectors |
| Filtered | - |
| RoHS | Y |
Description
Reference MPN listed for 557-080M2B. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
1210370058
Circular DIN Connectors DIN FORM B M12 LED
T3324-951
Circular DIN Connectors MALE CABLE CONNECTOR 4 WAY
M55116/14-4
DIN Connectors M55116/14-4
C091-31K014-101-2
Circular DIN Connectors MALE CABLE CONNECTOR 14 WAY RIGHT ANGLE
85072331
Sucoform hand-formable microwave cables have a tin-soaked copper braid for the outer conductor, giving them outstanding hand-formability and a distinct mechanical advanatage over semi-rigid cables
SC4917
7/16 DIN Female (Jack) Low PIM Connector Stub Terminal 4 Hole Flange (Panel Mount), Solder
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.