Product details
连接器与射频产品 connector; protection IP20
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Image
Click image to enlarge.
Specifications
| IP rating | IP20 |
|---|---|
| Compliance | Y |
| Category | 连接器与射频产品 |
Description
Reference MPN listed for 2799322. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. The catalog also lists a sealing or protection value of IP20. Check that against the real environment requirement in RFQ. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
SCF64086
SMA Female to SMA Female Cable HF-086 Coax
395038019
Eurostyle ESE 39503 connector; configuration: Screw - Rising Cage Clamp; mounting Free Hanging (In-Line)
PL330-8
TWBNC connector; configuration: Plug Straight
500-016J15HN
D-Sub Backshells SHORTING CAN HEX HD NO LANYARD
DCMP37SJA197
D-Sub Standard Connectors DSUB 37 F PCB R/A G TIN
M83513/11-G01NP
D-Sub Micro-D Connectors
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology operates its own factory for RF/coaxial connectors, adapters, and cable assemblies and is not a trading company or affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.