Product details
I/O Connectors IBS RL 24 ADAP-T/ M23 BK
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | I/O Connectors |
|---|---|
| Product Category | I/O Connectors |
| Subcategory | I/O Connectors |
| Unit Weight | 4.667451 oz |
Description
Reference MPN listed for 2734222. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
241A25080X
D-Sub Standard Connectors LC-FLTR SLDR PIN ANG 9.4mmPREC MCHD CNT
R222414321
RF Connectors / Coaxial Connectors SMP M LD CM STR SQF PIN C100
2343522-5
I/O Connectors SFP56 STACKED 2X2 RECEPTACLE ASSEMBLY
SA3NMM300W-10
10 dB Fixed Attenuator N Male (Plug) to N Male (Plug) Directional Up to 3 GHz Rated to 300 Watts, Heatsink Body, 1.4 VSWR
M300-FC70305F2-0300L
3 Pos. Female SIL 22 AWG Cable Assembly, 300mm, single-end, Jackscrews
RV6MJKURD-B24
Modular Connectors / Ethernet Connectors CAT6+ JACK RED 24PCS PER PAK
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.