Product details
Modular Connectors / Ethernet Connectors 8P 8P8C RA CAT 5 RJ45 SHLD THR
Part number (MPN)
Need a custom version from drawing?
We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | Modular Connectors / Ethernet Connectors |
|---|---|
| Product Category | Modular Connectors / Ethernet Connectors |
| Subcategory | Modular Connectors / Ethernet Connectors |
| USOC Codes | RJ45 |
| Performance Category | Cat 5 |
| RoHS | Y |
Description
Reference MPN listed for 203512. Final fit needs the drawing or BOM. If mounting is missing here, confirm it from the drawing or mating requirement. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.
Similar Connectors
Related models:
031-3114-000
D-Sub Standard Connectors
HSDSJZSJZ08-18
RF Cable Assemblies HSD S Jk to HSD S Jk Pn 1234 to 1234 1.5M
173111-0531
D-Sub Backshells FCT HOOD S1 0 DEG MTL W/THMBSCRW
MWDM2L-15P-6E1-275B
D-Sub Micro-D Connectors MICRO D PREWIRED CON 15CNT PIN #26AWG
72926-C-40
RF Cable Assemblies IEC Insulated BNC Male 50 Ohm 40"
MWDM1L-31SBRR3T-.150
D-Sub Micro-D Connectors MICRO D PCB CONN 31SKT CNT .062"PNL
MPN Search Supports exact, prefix, and partial matching. ⌄
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.