Product details
D-Sub Backshells DSUB MET HD 9-50POS MLTI ENTRY W/JK SCR
Part number (MPN)
165X14429X
Before RFQ Clear inputs speed up review. ⌄
- • Share the reference MPN and source brand if it matters.
- • Add the BOM and volume split for production projects.
- • Attach the drawing or the key fit requirements.
Specifications
| Interface | D-Sub Backshells |
|---|---|
| Interface | EMI/RFI Shielded Backshell |
| Gender | Female |
| Orientation | Variable |
| Product Category | D-Sub Backshells |
| Subcategory | D-Sub Connectors |
| Shell Material | Zinc Die Cast |
| Cable type | 12.1 mm |
| RoHS | Y |
| Filtered | - |
| Number of Positions | 25 Position |
| Cable type | 2 Entry |
Description
Current reference data for 165X14429X: Variable. The catalog currently lists the configuration as: Variable. If mounting is missing here, confirm it from the drawing or mating requirement. Material is listed as Zinc Die Cast. That is useful for review, but it does not replace full project stack-up confirmation. Use this page to shortlist before RFQ, not as the final sign-off.
Use this page to shortlist before RFQ.
Similar Connectors
Related models:
AD-SMAJHDEFIJ-2
RF Adapters - Between Series SMA JCK to HDEFI JCK Smooth Bore
MWDM2L-37GP-6K1-6K
D-Sub Micro-D Connectors MICRO D ASSM PIN CON 37CNT #26AWG
0833-2X6R-55-F
Modular Connectors / Ethernet Connectors RJ45 Connector
L717TWA3W3PEP2V4RRM6
D-Sub Mixed Contact Connectors D-SUB HYBRID
GRF1-J-P-08-E-ST-TH1
RF Connectors / Coaxial Connectors 5.00 mm 50 Ohm Ganged Micro-Miniature RF Plug, Cable Assembly
241A28670X
D-Sub Standard Connectors 37POS 370PF SDRPIN ANG .318
MPN Search Supports exact, prefix, and partial matching. ⌄
Supports exact, prefix, and partial matching.
Disclaimer
Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.