CSTONE
RFQ List

Product details

D-Sub Micro-D Connectors 36P R/A SHLD RECEP

China-sourced compatible alternative — fit confirmed by drawing/spec review.

Part number (MPN)

10236-5212VC

Need a custom version from drawing?

We coordinate supplier-qualified RF connector and cable assembly sourcing from drawings, samples, or BOM. Typical production lead time is 3–6 weeks after drawing/spec review; feasibility, MOQ, and fit are confirmed by RFQ.

Custom RF cable from drawing →
WhatsApp — Quick Reply
Lead time: 3–6 wks | MOQ: 200+ pcs
Before RFQ Clear inputs speed up review.
  • Share the reference MPN and source brand if it matters.
  • Add the BOM and volume split for production projects.
  • Attach the drawing or the key fit requirements.

Specifications

Specifications for 10236-5212VC
InterfaceMicro-D D-Sub Connectors
GenderFemale
OrientationRight Angle
TerminationThrough Hole
TerminationGold
Product CategoryD-Sub Micro-D Connectors
Current Rating1 A
SubcategoryD-Sub Connectors
Number of Rows2 Row
Shell PlatingNickel
FilteredUnfiltered
Part # AliasesJE150182192
Show 2 more specs
Number of Positions36 Position
RoHSN

Description

Current reference data for 10236-5212VC: Right Angle · Right Angle · Through Hole. The catalog currently lists the configuration as: Right Angle · Through Hole. Mounting is listed as Right Angle. If panel, bulkhead, or flange constraints matter, send the dimensions with the RFQ. Use this page to shortlist before RFQ, not as the final sign-off.

Use this page to shortlist before RFQ. MOQ 200+ custom production and supply path are confirmed after drawing/spec/BOM review; no spot stock is assumed.

Similar Connectors

Related models:

MPN Search Supports exact, prefix, and partial matching.

Supports exact, prefix, and partial matching.

Disclaimer

Manufacturer names, trademarks, symbols, and part numbers are used for identification and cross-reference only. Cstone Technology is a China-based export sourcing partner for compatible alternatives and is not affiliated with the original brands. Trademarks remain the property of their respective owners. Final suitability is confirmed by drawing/spec review during RFQ.